Saturday, March 9, 2013

Wet Well and Pipe

 Truck carrying the HDPE pipe
 Track hoe digging out the trench for the new 24 inch in-take pipe
 Carrying pipe to the site
 24 inch HDPE pipe being fused together
 Wet well stacks

 Carrying in the wet well
The 3 man crew from American Golf Construction is top notch.  They have already installed the wet well and the 24 inch in-take pipe.  Next step is to start back filling the the wet well and the trench leading into the pond.  We will be repairing the pond liner and once that is done we will start filling the lake again.  Keep checking back in daily to see our progress. 